SorbWeb Plus System:

Virtually Maintenance Free—Eliminates the Need for Elaborate Water Control & Handling

No electric Wiring or Mechanical Parts Required

No Monitoring Required

Proven Effective 24/7 Spill & Leak Protection

Provides Fire Suppression (Fire Quenching Stone Surface Layer—Reduces Fire Spread)

Significantly Reduces Liability Associated with Oil Spills

Easy to Repair; Modify & Expand

Polymer Half-Life is Greater than 200 Years under an Oxygen-Starved Environment

Engineered Hydraulic Containment System

Shallow Excavation Depth (Generally Less Than 24”)

SorbWeb™ Plus Geocomposite Liner Components are easy to install & replace

Life expectancy exceeds the Lifetime of the Transformer

 

Typical Design Applications:

Ground-Based Transformers on Pads  

Ground-Based Transformers on Grade  

Deck-Mounted Transformers  

Transformers protected with Deluge Systems

 

Installation & On-Site Assembly:

SorbWeb™ Plus Installation does not require shutdown of Station Electrical Equipment

SorbWeb™ Plus Liner System is Modular in Design & easy to install, disassemble, or reconfigure

A unique aspect of the SorbWeb™ Plus System is its passive ability to be effective Oil Containment Method  

SorbWeb™ Plus System use a modular liner design that offers extreme design flexibility & effectiveness.  Liner support containment design can employ poured concrete, berm, or fabricated support walls  

SorbWeb™ Plus Systems can be placed around individual electrical components or other larger oil-filled equipment  

SorbWeb™ Plus Systems can be installed over or under cable trays & other obstructions within the containment area  

SorbWeb™ Plus System is a long-term semi-permanent installation fastened to a support wall (berm or fabricated wall). SorbWeb™ Plus Systems can easily be uninstalled by removing the fire-quenching stone (vacuum truck) & individual liner layers.  Excavated SorbWeb™ Plus Systems can be re-installed at locations with the same design criteria  

The SorbWeb™ Plus System excavation depth is generally less than 24” maximum & may be considerably less, depending on the size of the containment footprint determined for a specific site  

Electricians are not required for installation

A forklift is required for unloading & placing material

 

 